Foundation
Cut *** 2×6 to *** feet for the band and *** 2×6 to *** for the floor joist. Nail through the band and into the joist using 3 1/2 inch nails.
Add *** 4×4 skids to the bottom of the floor frame. Use 3 1/2″ nails and toe nail into floor joist and into the skids.
Square the frame floor by measuring diagonally as shown above, until both ends measure the same.
Measure, cut, and install the 3/4″ inch tongue and groove plywood.
*** *** 3/4″ inch tongue and groove plywood.
*** *** 3/4″ inch tongue and groove plywood.
See illustration above for details.
Nail into frame using 1 1/2″ nails.
*** *** 3/4″ inch tongue and groove plywood.
*** *** 3/4″ inch tongue and groove plywood.
See illustration above for details.
Nail into frame using 1 1/2″ nails.
Project IndexFoundation…..4
PDF Download: Save To Your Computer – Print Out When You Need Them
Instant Download – Safe and Secure Payments and Downloads
See The Project Index Above For Plan Sample
Type:
|
Size
Width X Depth:
|
Price:
|
|
Gambrel Barn Shed With Loft 005
|
12’x12′ More Info |
$12
|
|
Gambrel Barn Shed With Loft 005
|
12’x10′ More Info | $12 | |
Gambrel Barn Shed With Loft 005
|
10’x10 More Info | $12 | |
Gambrel Barn Shed With Loft 005
|
10’x12′ More Info | $12 |
Shopping List
Type:
|
Size
Width X Depth:
|
|
Gambrel Barn Shed With Loft 005
|
12’x12′ | |
Gambrel Barn Shed With Loft 005
|
12’x10′ | |
Gambrel Barn Shed With Loft 005
|
10’x10′ | |
Gambrel Barn Shed With Loft 005
|
10’x12′ |